Ontario Power Generation: Pickering, Bruce, and Darlington, Canada
|
Click to see Solutions Delivered
| Main Control Room Panels for Plant Control |
Shutdown System |
| Logic Relay Panels |
Ion Chamber Amplifiers & Trip Comparators |
| Trip Test/Alarm Control Buffer Amplifiers |
Logic Modules & Printed Circuit Boards |
| In-core /Trip Test/ Alarm Control Buffer Amplifier |
Post Accident Communication System |
| Shut-Off Rod Drop Logic Modules |
Stack Monitoring System |
| Far Area Gamma Monitoring (FAGM) |
PHT LRV Stoke Time Test Modules |
| Containment Box-up Monitoring System |
Digital Panel Meters |
| Level Switches with Junction Boxes |
Type II Relay Modules |
| Solid State Timers |
250VDC Voltage Sensing Relays |
| PSVS Temperature Alarm Monitor |
EHG Speed Sensor Detect Module |
| Reactor Trip Switches SDS 1 |
Reactor Trip Switches SDS 2 |
| Clutch Control Modules |
|
Korea Electric Power Corporation: Wolsong 1,2,3,4, Korea
|
Click to see Solutions Delivered
| Main Control Room Panels for Plant Control |
Shutdown System |
| Logic Relay Panels |
Ion Chamber Amplifiers & Trip Comparators |
| Trip Test/Alarm Control Buffer Amplifiers |
Logic Modules & Printed Circuit Boards |
| In-core /Trip Test/ Alarm Control Buffer Amplifier |
Post Accident Communication System |
| Relative Humidity Systems |
Solid State Timers |
| Tritium-in-Air Monitoring System |
Failed Fuel Location System |
| Shut-Off Rod Drop Logic Modules |
|
Third Qinshan Nuclear Power Company: Qinshan 1 and 2, China
|
Click to see Solutions Delivered
| Main Control Room Panels for Plant Control |
Shutdown System |
| Logic Relay Panels |
Ion Chamber Amplifiers & Trip Comparators |
| Trip Test/Alarm Control Buffer Amplifiers |
Logic Modules & Printed Circuit Boards |
| In-core /Trip Test/ Alarm Control Buffer Amplifer |
Post Accident Communication System |
| Relative Humidity Systems |
Solid State Timers |
| Tritium-in-Air Monitoring System |
Failed Fuel Location System |
| Shut-Off Rod Drop Logic Modules |
Junction Boxes |
| Temperature Transmitters for RTD’s |
High Temperature Cables |
| Computer Systems for GCLM |
Chemical Laboratory Equipments |
|
Nuclearelectrica: CERNAVODA I, Romania
|
Click to see Solutions Delivered
| Main Control Room Panels for Plant Control |
Shutdown System |
| Logic Relay Panels |
Ion Chamber Amplifiers & Trip Comparators |
| Trip Test/Alarm Control Buffer Amplifiers |
Logic Modules & Printed Circuit Boards |
| In-core /Trip Test/ Alarm Control Buffer Amplifier |
Solid State Timers |
| Tritium-in-Air Monitoring System |
Relative Humidity Systems |
| Shut-Off Rod Drop Logic Modules |
|
Nuclearelectrica: CERNAVODA II, Romania
|
Click to see Solutions Delivered
| Gr. 2 Safety Cabinets (40 VDC) |
Accelerometers for fueling Machine Bridge |
| Solid State Timers |
In-core Amplifiers with trip comparators for SDS-2 |
| Ion chamber Amplifiers for Reactor Regulating systems |
Spare Components and Maintenance Tools |
| Radiological and Special Lab Equipment |
Conductivity Measurement Systems and Analyzers |
| Differential Pr. Guages and Switches |
Connectors Assembly and Cages |
| Dew Point and Relative Humidity Systems |
Electronic Function Generators and Signal Selectors |
| Gross Containment Leakage Monitoring Systems |
Smoke Detectors |
| SDS-2 In-core,trip Test/Alarm Control Buffer Amplifiers |
High Temperature Cables and Connector Assembly |
| D.C. Power Supply |
Power Supplies 90 to 110 volts |
| Ion Chamber Amplifiers with Trip Comparators |
Isolation Modules |
| Electrolytic condensors |
Type II Relay Modules |
| Major Refurbishment of Control Panels |
|
Nucleoeléctrica Argentina: Embalse, Argentina
|
Click to see Solutions Delivered
| Post Accident Communication System |
Shutdown System |
| Logic Relay Panels |
Ion Chamber Amplifiers & Trip Comparators |
| Trip Test/Alarm Control Buffer Amplifiers |
Logic Modules & Printed Circuit Boards |
| In-core /Trip Test/ Alarm Control Buffer Amplifier |
Solid State Timers |
| Tritium-in-Air Monitoring System |
Relative Humidity Systems |
| Shut-Off Rod Drop Logic Modules |
Failed Fuel Location System |
|
New Brunswick Hydro: Point Lepreau, Canada
|
Click to see Solutions Delivered
| Fission Chamber |
Shutdown System (Group 2) |
| Tritium Monitor |
Ion Chamber Amplifiers & Trip Comparators |
| Trip Test/Alarm Control Buffer Amplifiers |
Logic Modules & Printed Circuit Boards |
| In-core /Trip Test/ Alarm Control Buffer Amplifier |
Health Physics Monitoring Equipments |
| Start-up Instrumentation for independent channelized |
|
Hydro Quebec: Gentilly-2, Canada
|
Click to see Solutions Delivered
| Dynamic Signal Compensator |
Shutdown System (Group 2) |
| Start-up Instrumentation |
Ion Chamber Amplifiers & Trip Comparators |
| Trip Test/Alarm Control Buffer Amplifiers |
Logic Modules & Printed Circuit Boards |
| In-core /Trip Test/ Alarm Control Buffer Amplifier |
|
L3 COMMUNICATIONS MAPPS: Montreal, Canada
|
Click to see Solutions Delivered
| Custom building all kinds of VRTU’S,RTU’S |
Computer Simulation Key Boards |
| Reactor Power Display Units |
Reactor Trip Switches |
|